In June 2018, King machine’s Engineer was asked to go to Tanzania to debug Water filling machine,The machine is described as follows.
King Machine integrates five process steps – preform feeding, blowing, labelling, filling and cap feeding – into a single system, utilising integrated equipment intelligence to provide continuous production optimisation and performance enhancement.
One of King Machine customer from Tanzania bought the whole water bottling machine for pet bottle:
Bottle sizes: 500ml
Bottle shape: King Machine designing engineer helped customer in bottle shape
Water filling machine capacity: 8000BPH
All reqeusted auxiliary machines: preform bottle blowing machine, water treatment system, water washing filling capping machine 3 in 1, bottle labelling machine, sleeve wrapping machine.
The post King machine’s Engineer went to Tanzania to debug Water filling machine appeared first on king machine.